Mini Cooper Forum banner

status 1200

29477 Views 133 Replies 27 Participants Last post by  jamesant
my car order has gone into status 1200 - anyone know what this signifies?
1 - 6 of 134 Posts
Got hold of the full list of UK status codes for those who like that kind of thing:
0000 Cancelled
0037 Model or Feature Unavailable
0077 No Quota Available
0097qq No Current Event Allocated
0500 Cannot be Scheduled

1100 Scheduled
1200 Scheduled for Production
5000 Confirmed for Production
5050 Chassis Number Allocated
5055 Confirmed by Production Control

5100 Bodyshop Start
5190 Bodyshop Complete
5200 Paintshop Start
5270 Paintshop Complete
5300 Pre-Assembly Start
5400 Assembly Start
5500 Assembly Complete

6000 Transfer to Distribution
8200 Released to Carrier
9000 Departed Plant
9615/35/45 In Storage
9610/20/30/40/50/60 In Transit
9800 Arrived Dealer
See less See more
  • Like
Reactions: 5
Still a **** shame we cant track our cars like the US can
  • Like
Reactions: 4
i'm now at 5050!

5050 Chassis Number Allocated
  • Like
Reactions: 2
And two weeks later its pickup time this friday! Dealer notified that the car was built on monday and it arrived with them today, obviously straight from the factory rather than through thorne.

Really nice touch from lloyd blackpool was a video clip showing my car at their compound. I wont share on here as it includes the salesperson which wouldnt be fair but hoe exciting to get a glimpse of it in the metal
  • Like
Reactions: 3
Mine did say lead times are still a complete lottery at the moment. Im certainly not complaining at 8 weeks
  • Like
Reactions: 1
1 - 6 of 134 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top